Sanitary Sewer Extension and Plant Upgrade

We provided project management, planning, design, permitting, and construction phase services for this sewer extension project. The project entailed the extension of sanitary sewer service to approximately 350 additional EDUs and included one pump station and an expansion to the wastewater treatment plant.

The collection system includes the installation of approximately 80,000 feet of force main 6” to 10” sewer and one submersible pump station. The treatment plant capacity was increased from 0.75 MGD to 1.50 MGD and includes:

• New headworks facility with: mechanically cleaned automatic screening, influent pumping, distribution box, and electrical control room
• Two additional sequencing batch reactor (SBR) tanks
• Rehabilitated ultraviolet disinfection system
• Effluent pump station (for high receiving water conditions) with process water system
• Rehabilitation of two existing SBR tanks
• Rehabilitation of existing digester tanks
• Aeration blower replacement

Client / Owner

Fairchance Georges Joint Municipal Sewage Authority, Fayette County, PA

Related People

Contact an HRG Water & Wastewater Professional for more information on this project or related services.

Related Projects