Effective Utility Management Starts With These Strategic Planning Tips

Strategic Planning Whiteboard

This article was originally published in the June 2016 issue of  Keystone Water Quality Manager. It is reprinted here with their permission.

We’re all familiar with the phrase “If you don’t know where you’re going, any road will get you there.” This is paraphrased from an exchange between Alice and Cheshire Cat in Lewis Carroll’s Alice in Wonderland. Like Alice, you know you need to get “somewhere” because changing regulations, increasing costs, aging infrastructure and customer growth affect the way you provide your service. Each year as operators, managers, and board members, you’re forced to establish budgets, adopt rates and policies, and make recommendations that have long-lasting effects. You may use the best information available at the time but can’t be sure that you’re adequately prepared for what’s just around the corner.

Strategic planning is a tool that helps to identify where you need to go and the best road to get there by exploring the fundamental values and principles that support your utility’s policy and operating decisions. Properly done, it looks at all aspects of the utility’s operations in order to see if they reflect the needs of your customers, ensure regulatory compliance, and generate sufficient financial resources to be sustainable. This is not just a financial plan focused on replacing existing facilities or acquiring new ones, but a comprehensive look at the factors that will drive both short and long-term events and an identification of strategies to address them.

There are five basic elements in a strategic plan:

  1.  Vision
  2. Mission Statement
  3. Critical Success Factors
  4. Strategies and Actions to Meet Objectives
  5. Prioritization and Implementation Schedule

However, there can be as many additional elements as the utility feels is necessary to properly address the needs of all its stakeholders: its users, employees, and the community at large. Some of these elements may take a long time to complete, while others can be accomplished relatively quickly. For some, a good deal of data will be needed, while others will simply reflect widely accepted industry practices and preferences. The plan could take a month or a year to complete, depending on the level of detail believed to be required. However, one of the benefits of the planning process will be simply identifying the stakeholders and discussing the elements of the plan with them. The ability to identify areas of consensus and concern is a hugely important and valuable outcome of the plan.

Getting Ready for Strategic Planning

Before you can begin the process, there are some preparatory activities that should be completed:

Authorization
The first task in strategic planning is obtaining the authorization to move forward with the process at all. It is important to involve all of the decision-makers in the strategic planning process, and discussing the scope of the plan and its benefits is one of the best ways to achieve “buy-in” for the entire process. Without buy-in, it will be difficult to fully implement the resulting plan.

Identification of Stakeholders
Another important step is to make sure the process considers all relevant points of view. This may seem easy, but, when you actually begin to list them, the number of people and organizations relying on your utility to be well-managed and provide affordable, high quality service is probably greater than you think. While some seem obvious, consider the following examples:
• Current users
• Employees
• Regulatory agencies, including PA DEP and US EPA
• Municipal government, conservation districts and planning agencies
• The Chamber of Commerce or local economic development agency
• Future users, including land owners and developers

This is not intended to be a complete list, only a guide, and not every group will require the same level of involvement in the strategic planning process, but understanding how each group might be impacted is important.

Planning Your TimetableDetermination of the Plan’s Time Frame
Strategic plans are generally long-term, usually five years, but a different time horizon may be more useful if you are aware of some specific event likely to occur just beyond the five-year planning period. If a significant expansion of the utility appears likely, five years may not be long enough.

Organization
How will the strategic plan be organized? Who will guide the process? Is it to be done by an outside professional or internal staff? What is the schedule? What will the final plan look like, and how will it be disseminated? Does it need some type of formal adoption or approval? If so, by whom?

Determining the “Vision”

In essence, visioning asks the question: What will the organization look like in the future? Visioning will supply the context for the other elements of the strategic plan. For a wastewater utility, the visioning process may actually be one of the most involved elements of the plan since this is where you try to get a peek at what’s around the corner. Unlike some businesses where visioning is a projection of some blend of marketing prowess, economic predictions and industry trends, each utility is unique because the factors that drive future events will impact it differently.

The task is made a bit easier if you divide visioning into an external scan and an internal scan. Although they may be related in many ways, the external scan looks at:Financial Reports

  • potential changes in the regulatory environment,
  • community growth and development,
  • changes in demographics,
  • future interest rates,
  • future construction costs,
  • the overall level of economic activity.

(Increased economic activity in nearby communities should also be considered since it may impact your service area.)

The internal scan will focus more on:

  • the needs of existing users and employees,
  • service improvements,
  • transparency,
  • facilities,
  • finances,
  • rates,
  • operating policies,
  • organizational structure.

These are but a few of the areas that need to be considered in some detail.

The visioning process is almost as diverse as the elements themselves. Clearly, information from outside the utility is necessary. This may include individual interviews with consultants, suppliers and community leaders. Telephone calls, questionnaires, online surveys, and specific messages printed on bill inserts can also solicit feedback from targeted stakeholders. Regardless of how it’s done, the result should be a clear and concise statement that reflects the major trends that are likely to drive the future direction of your utility. But, before you can get too specific, you should develop the broad organizational goals. This is best done with a mission statement.

Drafting a Mission StatementDrafting Your “Mission Statement”

I know the idea that you can somehow cram the entire essence of an organization into a couple of tightly worded sentences seems impossible. Some mission statements will run on for several paragraphs, but do they really provide more information about the philosophy or principles that govern the utility’s operations? Usually not. Instead, the discipline of packing an organization’s values into a few words may actually provide a better understanding of its goals. Here is an illustration of a short but insightful mission statement for a wastewater utility, courtesy of the Lancaster Area Sewer Authority:

“To provide quality service and apply technology to process wastewater so as to protect and enhance the environment and health and well-being of the community at a reasonable cost.”

The mission statement should not simply be a collection of carefully chosen words that project an image that isn’t consistent with the utility’s values; rather, creating the mission statement should foster a deeper understanding and commitment to those values. This, in turn, provides the benchmarks that measure success.

business-servicesIdentifying “Critical Success Factors”

The visioning process should identify the broad goals and major initiatives that need to be incorporated into the strategic plan. It is not important to determine their feasibility at this point; detailed examination of alternatives will be done later. Simply decide if they are consistent with the mission statement and are not mutually exclusive. Some likely success factors might include:

  • Achieving greater transparency.
  • Building up operating and capital reserve accounts.
  • Having all professional employees become certified in their specialty.
  • Exploring alternative billing and payment procedures.
  • Creating or reviewing emergency response procedures.
  • Reviewing or increasing use of technology to achieve greater efficiency.
  • Expanding facilities to accommodate expected population increases.
  • Developing an action plan should demographic changes result in reduced flows.

These are only illustrations; the vision and mission statements will help dictate the critical success factors that should be included in your plan. The key here is to keep the success factors general in nature but focused on specific identifiable outcomes. Another important consideration is quantifying what it means to be successful and the metrics for measurement.

From the above illustration, achieving greater transparency is a success factor, but what exactly does that mean? What is it that should be more transparent, and what are the limits of what is made publically available? Can it measured by the number of visits to your website, or does it mean the creation of a website? Is it measured by a fewer number of requests for specific information or telephone inquiries? How about the development of a newsletter? Is that something that most customers believe would be useful based on data collected during the visioning process?

Some critical success factors may not be determined directly. In the example above, data may not have been collected on customer’s preferences during the visioning process. In that case, the success factor of achieving greater transparency will need to be defined by some other precedent activity to measure the benefits of transparency, or it may be determined that transparency is simply a virtue for its own sake whose benefits may not be immediately measurable. In that instance, the precedent activity may be to look at industry practice and see how your current practices can be improved.

If you are getting the idea that developing the critical success factors is a time-consuming process that requires a lot of effort in order to be done correctly, you’re right. This is often the work of several individuals and should involve a team approach at least to direct the work. Care should be taken to assign responsibility for completing an assignment to someone who is involved in the overall planning effort. If not, they may not understand the actual goal and may simply complete a task.

Developing critical success factors, defining them, and providing metrics for measurement is at the very heart of the strategic planning effort. While strategies and actions will provide the “to-do list” and ultimately become the basis for the final report, they will be driven first by the critical success factors you’ve defined.

Developing “Strategies and Actions”

This step is where the plan is actually created. Critical success factors identify the areas where some action seems warranted; they take our broad goals and further define the “somewhere” we want to go. The next step is determining how to get there.

negotiating_at_the_deskAgain, using the transparency example, probably everyone will agree that organizational transparency is desirable, but someone might disagree with the type of information that is made available or with the level of training that may be necessary to organize and screen information. Cost is always a consideration when implementing changes.

Because there are generally many facets to each critical success factor, it is important to have several individuals involved in formulating the strategy for evaluation and implementation. This is often accomplished by group meetings, where each critical success factor is discussed. Questions will likely arise that cannot be answered without some further investigation, so tasks must be delegated to a smaller group or an individual for follow-up. In fact, most of the early efforts will be directed to developing the process to obtain the necessary information and assigning someone to gather and analyze it. The analysis is essential so that the success factor can be implemented in a way that achieves its intended purpose. It also provides documentation for any critical success factors that cannot be implemented.

Once the strategy for implementation is determined, specific detailed actions for implementation should be prepared. One of the most important decisions in this stage of the process is timing. You want to think about the best time to launch a new initiative or modify or eliminate an existing one.

Another important task is to identify someone to champion the implementation. Maybe there is one lead person or several depending on the type and number of tasks. If achieving the critical success factor requires technology changes, someone involved with maintaining that technology should be involved in the implementation. This may seem obvious, but sometimes third parties are retained for implementation, resulting in a loss of buy-in from those who will be responsible for making it all work.
schedule

Prioritizing Tasks and Designing an Implementation Schedule

Even though this article opened with a reference to a fairy tale, there should be no fantasy about implementation. It’s just as much work as each of the other elements — maybe more, since there are now clear ideas on how each goal is to be achieved and, of course, the devil is always in the details. Regardless of how thorough the analysis was, complications can be expected. Another frustration usually is that it takes longer to accomplish than originally believed.

In order to avoid this, one of the first steps to implementation is to determine the schedule. Unless there are very few and straightforward critical success factors, some effort needs to be expended in prioritizing each success factor for each of the broad goals identified in the vision. Often, once the strategic plan is formalized, a sense of urgency to implement its objectives is inevitable. This is understandable since the reason for the plan is generally to improve the utility’s operations, so why would you want to delay?

For one thing, it’s important to remember that the plan itself looks at a five-year time period, so that not all benefits will be immediately available. Also, events are constantly changing, so some of the fundamental assumptions that went into the plan may change. This may not affect the plan, but the implementation schedule should allow time for monitoring external changes nonetheless.

Another important consideration is the time staff has available to implement the plan. While the plan is being implemented, all other work must continue. Even if some of the heavy lifting is assigned to others, the utility’s staff needs to be involved at each step if they are expected to achieve the plan’s goals and provide necessary feedback.

microphoneCommunicating the Plan with Your Stakeholders

Okay: you have the vision, you’ve determined the critical success factors, you’ve developed strategies for implementation, and you’ve created the implementation schedule. You have assigned staff to implement the various strategies in order to monitor progress and make sure that each strategy achieves its desired goal. One question remains: What does the final plan look like? Is it a printed document, a slide presentation published on your website, or an internal spreadsheet that serves as a checklist for monitoring implementation?

Like all the other aspects of the plan, the process that rolls out the plan is determined by the goals of the strategic plan itself. If the plan is centered on internal improvements, then employee meetings with handouts may be the most effective means of communicating the plan’s objectives and the strategies designed to implement them. If there are elements of the plan that are service-related – that impact your customers or the community at large – more formal printed materials may need to be prepared. Meetings with important relevant stakeholders may also be useful, especially if there are some financial impacts associated with the plan that they are expected to share.

The only thing that’s constant is change. Absent a crystal ball, tarot cards, or an Ouija board, a well-thought-out strategic plan is the best means of seeing the future. Even if it misses the mark, knowing why it missed and what parts of the utility may be affected is an important benefit that makes the exercise worthwhile. At the very least, developing the plan will require policy-makers, managers and staff to consider each other’s points of view and understand how the customers and community view your utility.

Sanitary Sewer Overflow Solution Comes from An Unlikely Source: A Fish

Sanitary Sewer Overflow

This article on how Middletown Wastewater Treatment Plant solved its Sanitary Sewer Overflow problem was originally published in the June 2016 issue of Keystone Water Quality Manager. It is reprinted here with their permission.

No doubt a fisherman would be intrigued seeing a rock bass on the fine screen at the Middletown WWTP, but the ear tuned to hear “inflow” was even more intrigued.

The visit from the rock bass had been preceded by two decades of inflow reduction efforts due to Sanitary Sewer Overflow issue (SSOs). Yet despite increased interceptor sizes and redirected flows, the SSOs continued. A sewer system dating back to the 19th century can indeed be challenging, but sometimes solutions are inspired in the unlikeliest of ways.

Discovery of the rock bass was mentioned casually at an authority meeting, and immediately the authority’s engineer began to wonder if there was an unknown connection between the borough’s sanitary sewers and storm sewers. Rock bass are not kept as pets, of course, so the fish would not have entered the system from a toilet or home drain. It must’ve come from Swatara Creek.  There is no way the fish came through the WWTP effluent pipe, and only the local storm sewers discharge to Swatara Creek, not the sanitary sewers.  Therefore, the fish must’ve entered the sanitary system directly from a connection with the storm sewers.  But where?

After several discussions with treatment plant operators and other staff at the borough and authority, the engineer was able to narrow the search down to three possible locations, one of which was located at the site of a streetscape project under construction at the time. Searching this area for a sanitary and storm sewer connection would be very difficult because it was the heart of the borough’s downtown business district and was surrounded by a nest of other utilities and old Brownstone businesses.  Yet the effort was worth it: By carefully coordinating with the contractor, the borough was able to discover the unknown connection between the local sanitary and storm systems, and, once it was corrected, sanitary sewer overflows (and basement back-ups at local businesses) were finally eliminated!

Middletown sewer connection

This story illustrates the importance of harnessing the feedback and input of your operators and staff at all levels of an authority’s organization. Had the operators’ odd discovery of the rock bass (later nicknamed Leaky) never made it to the authority and their engineer, SSOs could’ve potentially continued in the borough for many years.  Operators possess unique knowledge of a system’s materials, construction and history.  This knowledge has real value that can lead to major cost savings like those realized by this solution to the borough’s inflow problems.

As this story shows, incorporating the input of operators and staff at all levels of an organization can make finding solutions to your most puzzling challenges as easy as shooting fish in a barrel (or fine screen).


Joshua Fox, P.E.,Josh Fox is the eastern Regional Service Group Manager for HRG’s Water & Wastewater Service Group. He has extensive experience in the planning and implementation of I/I Programs and rehabilitation projects. 

 

Bruce HulshizerBruce Hulshizer, P.E., is a project manager in HRG’s Water and Wastewater Service Group. He has two decades of experience in civil engineering and is an active member of the Pennsylvania Water Environment Association, where he serves as co-chair of their Collection System Committee.

Tips Municipalities Can Use to Prepare for Flooding

by Erin Letavic, P.E.
Flooded Street

More than 83,000 homes in Pennsylvania are at risk of property damage from hurricane storm surges, according to a report from a California company specializing in financial and property related business intelligence.  The company, CoreLogic, estimates reconstruction costs for these properties could be as high as $11 billion if all the properties were destroyed.  This makes Pennsylvania the 13th highest-risk state for hurricane property damage.

Though Americans primarily associate hurricane damage with coastal states like Florida and Louisiana, Pennsylvania can also be inundated with storms related to hurricane activity (as anyone who survived the severe flooding of Tropical Storm Lee in 2011 can attest).

In addition, researchers at Penn State University who have been studying weather patterns predict that heavier storms are expected to occur more frequently in the coming decades. For example, a storm with a 24-hour rain total that used to occur once every 20 years is predicted to occur every 12-16 years by the year 2050.  This means, flood events that used to be rare will happen more frequently.

Accordingly, Pennsylvania municipalities should be prepared for heavy storms and the flooding and property damage they can bring. This means every municipality should have a flood preparedness program and should examine its infrastructure construction standards to make sure it is mitigating the risk of more frequent flooding.

The first step in preparing for flood risk is to identify where flooding is most likely to occur and what infrastructure will be affected.

Do you know what parts of your community are in the FEMA floodplain?

Do you know how that floodplain is predicted to change in the coming years?

Do you have critical infrastructure related to your water and sewage treatment system located within that floodplain? What about your power grid?  High-traffic roadways or public transit routes?  Petroleum or chemical storage facilities?

Are your critical community centers located within that floodplain such as the police and fire facilities? Hospitals?  City hall?  Public works facilities?  Shelters?  Communications centers?

Do your sanitary and storm sewer systems have the capacity to handle heavy storms without overflowing polluted water into your local waterways?

A civil engineer with knowledge of floodplain mapping and municipal land planning can help you answer these questions. Then, once the risks have been properly identified, your engineer can help you minimize the risk by upgrading infrastructure and amending codes and ordinances to promote wiser land use.  For example, he or she can examine your local floodplain regulations to confirm they conform to those recommended by FEMA and that they are being properly enforced during the land development and building permit process.

Though it will cost money to take the steps outlined here, the cost of repairing the damage done by a lack of preparation could be much greater. By preparing for storm surge impacts today, municipalities can save lives and money tomorrow.


Erin Letavic, P.E., Erin Letavic is a project manager in HRG’s Civil Group. She helps municipalities throughout Central Pennsylvania manage their stormwater permits and assists with various other municipal engineering tasks such as zoning and subdivision and land development plan reviews.

Form-Based Zoning Can Bring Municipalities and Developers Together on the Walkable Communities Buyers Want

Photo by North Charleston.  Published here under a Creative Commons license.Walkable Community

The National Association of Realtors (NAR) recently released the results of a nationwide poll showing millennials increasingly prefer walkable communities over the spread-out developments in many present-day suburbs. Other studies have confirmed similar preferences for walkable neighborhoods and mixed-use development; however, traditional zoning approaches, which emphasize low-density development and a separation of land uses, makes it difficult for residential developers to obtain approval for these communities. This article explores the rise in popularity of the walkable community and discusses how residential developers and municipal planners can use form-based zoning to create a community that meets the needs of everyone.

The Case for Walkable Communities

In 2013, NAR’s Community Preference Survey found that 60% of respondents preferred a neighborhood that mixes housing with stores and businesses within walking distance, and 55% would give up a home with a bigger yard in order to get one within walking distance of schools, stores and restaurants.

Additionally, a study by Gary Pivo at the University of Arizona’s Urban Planning Program and Jeffrey Fisher at Indiana University’s Kelly School of Business found that – other factors being equal – enhanced walkability increased the value of both residential and commercial properties.  Using data from the National Council of Real Estate Investment Fiduciaries and Walk Score, they compared more than 4,000 office, apartment, retail and industrial properties and determined that a 10% increase in walkability increased property value by up to 9% for all but the industrial properties.  (There was no discernible impact on industrial properties with a higher walkability score.)

This is in line with other studies of traditional neighborhood developments (TND) published in Real Estate Economics and the Journal of Urban Economics, which found that buyers were willing to pay between 12-15% more for pedestrian-friendly homes in the studied neighborhoods, compared to similar homes in neighboring low-density communities.

Increased property values benefit the developer selling the home, but they also benefit the local municipality as they increase property tax revenues. In addition, high density, walkable communities reduce the amount of infrastructure (such as roadways, traffic signals, water and sewer line extensions) needed to connect spread-out developments, which can save the  municipality money that would’ve been needed to maintain that infrastructure.

The most important reason for municipalities to consider making their zoning friendlier to walkable communities, however, might be their desire to stay competitive as a place people want to live.

Millennials represent a demographic of 80 million people, and they are the generation that will be buying homes and putting down roots in the years to come. Michael Myers, a managing director at The Rockefeller Foundation, is quoted in an article on The Atlantic’s CityLab website, saying, “As we move from a car-centric model of mobility to a nation that embraces more sustainable transportation options, millennials are leading the way…Cities that don’t invest in [these options] stand to lose out in the long run.” 

Bridging the Municipal-Developer Gap with Form-Based Zoning

If municipalities and developers agree that walkable communities can be beneficial, why aren’t more of them being built?

Over the past few years, these communities have become more and more popular with both developers and municipalities, but acceptance still is not widespread. Traditional zoning ordinances could be one of the reasons why.

Traditional zoning ordinances separate land uses into distinct zones: Commercial is separate from residential. Single family homes are separate from apartments and townhomes, etc.  This prevents the construction of developments that combine commercial and residential uses of different types in one space like modern walkable communities do. In addition, traditional zoning has emphasized a low-density approach because communities associate higher density with a loss of open space and community character and fear higher density developments will drain community resources.  However, developers require a higher density approach in order to make the many amenities (such as recreational facilities and civic and commercial spaces) affordable in a typical walkable community plan.

But form-based zoning could be the bridge that closes the gap between a community’s concerns and a developer’s needs.

Rather than fixating on density values and strict land use definitions, municipalities using a form-based zoning approach create a vision for the type of community they’d like to have and set standards to realize that vision.  If they want a community that encourages walking and social interaction in public spaces, they can set standards that will promote these activities.  For example,  Public Space standards can specify the types of pedestrian amenities, greenspaces and recreation requirements that make a place feel safe, comfortable and walkable.  They can also set the size of a standard block and govern how roadways and pedestrian amenities interconnect.  (Keeping the size of blocks small will make them more manageable for walkers, and interconnecting streets will provide shorter routes and more evenly distribute car traffic throughout the roadway network.  This will, in turn, have the added benefit of reducing congestion that comes from concentrating cars on just a few heavily travelled corridors, as is common in many traditionally zoned communities today.)

By using a form-based approach, municipalities can focus more on the form and feel of a community, instead of limiting development to strictly separated zones with a one-size-fits-all regulation of lot sizes.

In turn, residents enjoy the quality of life they seek, and municipalities can continue to attract growth, maintain a healthy tax base, and reduce the expenses associated with sprawling infrastructure. Meanwhile developers are able to meet a market demand profitably without navigating an unnecessarily lengthy entitlements process.

This type of approach allows communities to remain relevant and competitive in the decades to come as millennials age, take their resources and preferences to market, have kids and nurture the next generation. Municipalities and developers that dismiss these trends as merely a fad may be taking a big risk. Is it worth it?  We will know in 20 years.


HRG excels at bringing developers and municipalities together to meet the needs of a community in a way that benefits all parties. To discuss how walkable communities could benefit you, please contact us

Building Voter Support for Stormwater Fees

Hand vote

Many local officials realize the need to improve stormwater management to protect water quality, but fear constituents would oppose a new fee for stormwater services. Experience shows a transparent approach that involves community stakeholders can build consensus.

by: Adrienne Vicari, P.E.
 

(These tips are excerpted from an article we published in the October 2015 issue of Pennsylvania Township News magazine and are used here with their permission. Reprints of the entire article are available upon request.)

Increasingly stringent stormwater regulations are causing municipalities to think about how they can fund badly needed stormwater system improvements in their community. Many municipalities are considering funding their program through user fees charged by a municipal authority, as authorized by Act 68 of 2013, but some municipal leaders worry that a new fee may be unpopular with residents and businesses.

Though stormwater utility fees are still largely unchartered territory in Pennsylvania (less than a dozen communities have established one here), the use of dedicated stormwater utilities and stormwater fees is a nationwide movement that has seen steady growth over the past four decades. Western Kentucky University reports that there are more than 1,500 stormwater utilities throughout the United States and Canada, serving communities as small as 88 people to more than 3 million. Their success in building consensus among constituents for stormwater fees can show local municipalities a path to approval in their own community.

HRG has used information from the Western Kentucky University study, the nationwide non-profit Water Words That Work, and several case studies published by the EPA (along with our own experience implementing stormwater authorities) to come up with several tips on how municipalities can build local support for stormwater user fees.

 

  1. Make sure you have identified and involved all the potential stakeholders – even those who oppose the formation of a utility – and form a stakeholder advisory committee. If you don’t attempt to address the concerns of your opposition in these committee meetings, they can come back to haunt you later when it comes time to pass the resolution. According to the EPA case studies, this is what happened in Dover, New Hampshire, and Huntsville, Alabama. Both communities had small advisory committees, but they did not engage all community groups. Though there was unanimous consent among the committee members to form a stormwater utility, the opposition of certain community groups who had not been represented on the committee ultimately drowned out their voices, and the municipal leadership declined to pass the resolution.
  2. Make the stakeholder committee an open forum where people feel comfortable expressing all points of view. Again, you want to deal with any potential obstacles proactively, rather than be blindsided by them in the final stretch. Stakeholder advisory committee meetings are more conducive to problem-solving and negotiating in a deliberative way than public meetings are. By including your opposition early in the process and giving everyone a chance to speak freely, you ensure that major obstacles to support will have been addressed before a public vote.
  3. Have your stakeholder committee discuss the stormwater program and what it can accomplish first. Don’t bring up funding till you’ve established a need for improvements and motivated people to support them. People need to know what they’re getting before they can be motivated to hand over their money.
  4. Clearly define the benefits of the program in all public outreach efforts. Tell people exactly what improvements you intend to make with the money you raise, and quantify the benefits of those improvements whenever possible. For example: “This project will reduce the likelihood of flooding along Main Street by 75%.”
  5. Show, don’t just tell. Visuals are particularly persuasive. Water Words That Work found that showing people photographs of how the fee would be used had the single most dramatic effect of any information provided in gaining approval of the fee.
  6. Choose your words carefully. Name the fee to clearly convey the service you are providing. “Stormwater management” is too vague and largely meaningless to the average person, but “clean water protection” has obvious value. In the Water Words That Work survey, “pollution control and flood reduction fee” tested better than any other term containing the words stormwater, authority or utility.
  7. Emphasize fairness. People generally believe that those who use a service most should pay more for it, so show them how your fee ensures that is the case. Explain why it’s important that non-profits pay the fee because they, too, contribute to stormwater discharges (often more than residents because of their large impervious parking areas). Tell them about credits that people can receive if they lower their stormwater impact by installing green infrastructure on their property. In general, people perceive fees based on actual impervious area to be the most fair and equitable (as opposed to a flat rate), but some of the communities EPA studied did successfully enact flat rates with effective public education about the reasons why that option was chosen.
  8. Demonstrate cost-effectiveness and be transparent about finances. If a stormwater utility is truly the best approach for your community, the numbers will convey that, and detailed economic studies are always an integral part of the planning process. Use those numbers to prove that the stormwater fee will better accomplish program goals than general fund revenue or any other option available. Voters can often be mistrustful of a government’s ability to use funds wisely. Being transparent about program finances (how the fee was determined, how it will be used) eases minds and reduces the chance of a legal challenge.
  9. Define this as a local solution to a local problem. Avoid talk about state and federal mandates or general environmental goals. If flooding is a recurring problem in your community, show how this program will reduce that problem. If pollution is a concern, talk specifically about keeping local waterways clean: the stream families teach their children to fish in, the lake where they go swimming.

Determining whether a stormwater utility is the most effective way to fund infrastructure needs in your community is a complex process that requires dual expertise in civil engineering and financial consulting. Unfortunately, some communities are afraid to even investigate the option because they believe their constituents will never approve of a stormwater fee.   In communities where utilizing general tax revenue is not the best fit approach, research by EPA and others cited in this article shows that an effective public outreach program, which includes key stakeholder groups in the earliest planning stages, can be successful in persuading people to accept stormwater management fees.


VicariAdrienne Vicari, P.E., is the financial services practice area leader at HRG. In this role, she has helped the firm provide strategic financial planning and grant administration services to numerous municipal and municipal authority clients. She is also serving as project manager for several projects involving the creation of stormwater authorities or the addition of stormwater to the charter of existing authorities throughout Pennsylvania. Contact Adrienne about stormwater authorities.

The Potential Advantages of a Stormwater Utility for Financing Your Stormwater Management Needs

by: Adrienne Vicari, P.E.

West Clarion University Pond

Two years after the passage of Act 68, many municipalities still have legitimate concerns about whether a stormwater authority would be right for their community. In a previous article, HRG addressed concerns about public opposition, up-front costs, and a loss of control over the infrastructure covered under the MS4 permit. In today’s article, we discuss the potential advantages of stormwater authorities to municipalities searching for ways to finance their stormwater management programs.

Advantage #1: Stormwater authorities enable you to collect money from tax-exempt users.

Churches and non-profit organizations like hospitals contribute a lot of stormwater runoff to the local watershed, but a tax would never collect any revenue from them because they are tax-exempt. By using the stormwater authority structure, you can charge fees to these users and collect their fair share contribution to stormwater management efforts.

Advantage #2: Stormwater authorities can collect fees from multiple municipalities who may be contributing runoff to their watershed; municipalities cannot charge anyone outside their own borders.

Political boundaries and watersheds seldom coincide. Stormwater is not neatly contained by political boundaries, and watersheds often cross through more than one municipality. But townships and cities cannot charge other local governments for stormwater management under state law. A multi-municipal (or joint) stormwater authority, however, can be set up to serve an area that extends beyond the boundaries of a single municipality, which enables everyone within a particular watershed to contribute to the stormwater management services it requires.

Advantage #3: Stormwater authority fees are more equitable than a property tax.

As stated in #1 and #2, stormwater utility fees ensure that everyone who contributes to a community’s stormwater pays for the services they use (even tax-exempt organizations, particularly if a utility is set up on a watershed-wide basis).

But stormwater fees are also much more flexible and responsive to the true nature of stormwater than a straight property tax would be. The value of someone’s land has little to do with how much stormwater it creates, so a property tax is inherently unfair for this purpose. A property could be appraised at a high value and contribute very little to stormwater, but an experienced financial consultant can help set up an authority’s rate structure based on the quantity and/or quality of runoff a property creates (rather than charging a flat fee or basing it on acreage).

A municipality can also offer credits to property owners who install best management practices for controlling runoff. (This has the added bonus of encouraging good behavior: inspiring people to install stormwater control measures like rain gardens, buffers, etc. on their property.)

Thus, a well-designed stormwater utility ensures everyone pays according to how much he or she uses the service.

Advantage #4: Stormwater authorities provide a dedicated revenue stream for stormwater improvements.

Relying on general tax revenue for stormwater improvements isn’t practical for some communities. There simply isn’t enough money to cover all of the needs the municipality must address, and stormwater often falls to the bottom of the list because money is allocated to more high profile projects such as a bridge replacement or pavement rehabilitation. Unless there is major flooding, stormwater is often forgotten and doesn’t receive the financial attention it needs.

With a dedicated stormwater fee, the money is there to maintain, repair and replace stormwater infrastructure on a proactive basis, rather than waiting till flooding causes expensive damage or impacts public safety.

Advantage #5: A dedicated revenue stream for stormwater can improve the finances of a municipality.

It can do so in several ways. First, now that the municipality no longer directs tax revenue to stormwater management, it has more tax dollars available for its other priorities.

Second, debt associated with stormwater improvements is no longer considered direct municipal debt because it can be self-liquidated by the authority’s revenue stream. Therefore, the stormwater debt doesn’t count towards the municipality’s borrowing limit, and its impact on the municipality’s bond rating is reduced. (Since municipal authorities are not subject to the same restrictions on borrowing and bond rating concerns as municipalities, they are often able to implement larger projects or make improvements in a timelier manner than a municipality could.)

Third, many agencies that offer grants and loans expect the municipality to put up matching funds, which is hard to do when you don’t have a dedicated stormwater revenue stream. Even if matching funds are not an official requirement of the grant or loan, most funding agencies place a higher preference on recipients who have money available for the infrastructure because they have a greater confidence in their ability to complete the project if there are issues and to maintain it after it’s done.

Advantage #6: Stormwater authorities are better positioned to raise rates than municipalities are to raise taxes if stormwater obligations increase.

Tax increases are not popular politically, and they are hard to pass. As stormwater infrastructure needs change, municipalities may need a revenue source that is flexible enough to meet those changing demands.

Every municipality’s financial situation and stormwater needs are different, so it’s wise to seek the counsel of a consultant with dual expertise in engineering and financial consulting to determine if a stormwater utility is right for your community. If it is, your consultant can help you organize a program that maximizes an authority’s potential advantages: providing a dedicated revenue stream for stormwater management that is more equitable than other funding sources and freeing up the municipality’s tax dollars for other priorities without adding to its direct debt or negatively impacting its bond rating.

 


VicariAdrienne Vicari, P.E., is the financial services practice area leader at HRG. In this role, she has helped the firm provide strategic financial planning and grant administration services to numerous municipal and municipal authority clients. She is also serving as project manager for several projects involving the creation of stormwater authorities or the addition of stormwater to the charter of existing authorities throughout Pennsylvania. Contact Adrienne about stormwater authorities.

Better Roads for Less Money with Asset Management

Freshcorn Road
Municipal managers are under pressure every day to deliver more services in spite of shrinking budgets. With only so much money available, they must make tough choices about what investments to make in their community. Though they’ve heard the benefits of asset management many times in recent years, they still don’t feel they have the money to invest in such programs – not when that money could be spent on the construction or repair of badly needed roadways, bridges, and pipes.

Many communities see asset management programs as an additional expense, but the truth is: asset management saves you more money than it costs.


See also: Position Yourself for Funding With Asset Management & Capital Improvement Planning


Imagine a tale of two cities: both celebrating the ribbon-cutting on a brand new roadway and each taking a very different approach to caring for it.

City #1 has no asset management or capital improvement planning program. It does not assess the condition of its roadways and plan long-term investments in their upkeep. It makes repairs when the need becomes obvious.

City #1 will make moderate investments in maintenance over the next 20 years, but the condition of the roadway will steadily decline. Ten years after the ribbon-cutting celebration, the roadway condition will be fair at best. Fifteen years after, the residents who heralded its construction will be grumbling about its potholes and cracks. Twenty years after, the condition of the road will be so poor that City #1 will need to completely replace the roadway at a cost of $1.2 million per lane mile.

City #2, on the other hand, has a robust asset management and capital improvement planning program. It routinely inspects the condition of its roadways and takes proactive action to keep those roadways in top form. With investments every five years of approximately $100,000 to resurface the pavement, City #2 maintains its roadway in good condition throughout the next two decades, keeping traffic flowing smoothly, encouraging growth and development, and making residents and local businesses happy. The condition of the roadway never declines to a state where travelers complain.

Roadway Conditions Over Time Graph

Over the same 20-year-period, the residents of City #2 will ultimately have paid less money ($400,000) than City #1 ($1.2 million) but will have enjoyed better roadway conditions over the long-term.

Still think you can’t afford to invest in asset management and capital improvement planning? As these two cities show, you can’t afford not to.

Stop Speeding in Your Neighborhood

A version of this article was printed in the September 2017 issue of Pennsylvania Borough News magazine.

stop speeding

A comprehensive traffic calming program that includes community education and involvement, enhanced enforcement, and engineering control is the most effective way to stop speeders and make your neighborhood safe for pedestrians.

Municipal officials frequently get calls from their residents about speeding on local streets.  People are worried that they or their children might get hit by a car, or a dangerous vehicle collision could occur.  These are valid concerns that need to be addressed.  Unfortunately, many residents think stop signs are the way to fix the problem, and they pressure their officials to post them on their street.

But stop signs do not reduce vehicle speeds.  They are meant to indicate who has the right-of-way when traffic is coming from different directions, and state DOTs require municipalities to conduct a stop sign warrant analysis to make sure the intersection meets the conditions necessary to require a complete stop. If a municipality installs a stop sign where it is not warranted, it can present liability concerns, and studies indicate that stop signs are not effective for reducing speed anyway.

Drivers respond more to roadway conditions than signage – especially if they feel that signage is in conflict with those conditions.  In study after study, drivers who come to a stop-controlled intersection with no other traffic in the area frequently roll through the sign, slowing down for a few seconds rather than coming to a complete stop.  Then they often speed up more aggressively after moving through the intersection to make up for lost time.

A study conducted in Michigan by Richard Beaubien and published by the Institute of Transportation Engineers showed that placing stop signs along a roadway increased driver speeds, rather than decreasing them, and studies in Boulder, Colorado, and California have had similar results.

Lowering the speed limit below typical roadway safety standards is also ineffective because most drivers travel at a speed they deem typical for the roadway conditions, rather than constantly checking their speedometer against speed limit signs.

So what can you do to stop speeding on your local roads?

Institute a neighborhood traffic calming program that emphasizes community involvement and combines education and enforcement with engineering techniques such as speed humps.

Educate your residents with a community awareness campaign
Studies and enforcement data history indicate that the majority of speeding on local roads is done by drivers who live in those neighborhoods, so a community education campaign that includes articles in the municipal newsletter or posters at community gathering places (such as schools, libraries, and recreation centers) can be very effective at increasing awareness and reducing speeds.  Articles in the local newspaper or community magazine can also be helpful if the problem is significant enough to warrant it, and yard signs reminding people to slow down reinforce the point.

Back it up with enhanced enforcement
When educating the public about a speeding problem in your neighborhood, it’s important to tell them why you want to reduce speeds (including information on any crashes that may have occurred or the compromised safety of pedestrians).  It’s also important to connect your education effort with enhanced enforcement by police and let people know that tickets will be issued.  Education by itself will not deter speeders for long; the threat of fines is necessary to reduce speeding over the long haul.

Control speed with engineering devices (like speed humps), as needed
While education and enforcement can help reduce excessive speed in most situations, sometimes drivers need an extra nudge or reminder to slow down.  A traffic engineer can help you install measures that will encourage or even force drivers to slow down such as speed humps, rumble strips, traffic islands, road narrowing, and pavement markings.  (In another article in this series, we describe each of these measures, their cost, and their effectiveness.)

A comprehensive traffic calming program like this that combines education, enforcement, and engineering design can be very successful at eliminating speeding on local roads, but governing requires the consent of the governed.  Therefore, the effectiveness of a traffic calming program depends most of all on how invested the community is in making it work.  This makes community involvement from the earliest stages very important.

Many communities find it helpful to create a committee of residents to address traffic concerns in the neighborhood.  The committee can provide information on speeding and other traffic issues and work with the municipal officials, their retained engineer, and police to devise a strategy to address them.  All final decisions are made by municipal officials, but the committee plays a significant role in advising them and helping to determine a solution.

Working as a team, municipal officials, law enforcement, and residents can make roadways safer for the entire community.

 


For more information on traffic calming programs, read our other articles:

Traffic Calming - speed humpSpeed Humps and Other Traffic Control Techniques

There are many different traffic calming techniques, ranging from planting trees to constructing geometric roadway improvements.  Read a description of the most common techniques, their cost, and their effectiveness.